2.7.3 permit: the Government, but the contractor will prepare a document providing employment and apply for a permit, but the expenses of employment.
2.7.4 management construction
2.7.5 control of construction work
Robot 2.7.6 made model. 
2.7.7 form to request permissions to St a Architectural and structural design
Because this is an ongoing project of the original project. Team permission is required. 
The original project team.
2.7.8 if the construction has been accelerated, object to or from a Government contractor is responsible. 
Correct, valid until the construction is approved.