5. Starting operation:
Key: If reverse the Channelizer, it is a big trouble. When start operation, must confirm the correction of rotating direction at JOG operation and then follow the below sequences.
(1) Switch on motor.
(2) Check the ROD is smoothly working.
(3) Check there is no bend at ROD
(4) Check carrier plate is smoothly working.
(5) Check Air pressure.
(6) Switch the control switch on.
(7) Check the position of photoelectric switch and no dirty.
(8) Try to block the light of photoelectric switch and check carrier plate distributing.