• Two sets of jump-form were used (in stepped operating mode)
for the construction of the core wall from 2/F up to 100/F
with some dimension re-alignment at a few floor locations
with the outrigger frame or where thickness of core wall
reduced.
• Connecting joint between the outrigger and mega column is
provided with design to cater for the differential deflection
similar to the IFC2 project.
• General composite frame structure is used for the tower up to
100/F, with the central core, an external steel frame rested
onto 8 mega columns which span about 16m.
• Hotel floors from 101/F upward are constructed in in-situ
method using Grade 60 reinforced concrete and traditional
large panel form, with a transfer structure at 101/F.
• Total amount of structural material consumed
• Concrete 240,000 m3, Reinforcing bar 98,000 tons, Structural
steel 27,000 tons
Results (
Thai) 3:
[Copy]Copied!
•< B >สองชุดของการกระโดดแบบได้ถูกนำมาใช้(ในโหมดการทำงานก้าวเข้าไป)สำหรับการก่อสร้าง
ของแกนหลักบนผนังจาก 2 / F ได้สูงสุดถึง 100 / F
พร้อมด้วยบางมิติใหม่อีกครั้งในการจัดวางเพียงไม่กี่ชั้นตำแหน่ง
พร้อมด้วยที่พัก Outrigger on the เฟรมหรือสถานที่ซึ่งความหนาของผนัง Core
ซึ่งจะช่วยลดลง.
•การเชื่อมต่อร่วมกันระหว่างที่ Outrigger และขนาดใหญ่มีคอลัมน์
ซึ่งจะช่วยให้บริการพร้อมด้วยการออกแบบเพื่อรองรับส่วนที่แตกต่างการหักเหแสง
เหมือนกับที่ชักชวน 2 โครงการ.
•กรอบโครงสร้างแบบคอมโพสิตทั่วไปใช้สำหรับทาวเวอร์สูงถึง
100 / F ,พร้อมด้วยที่อยู่ในศูนย์กลาง core , ภายนอก ทำจากเหล็กลงบนเฟรม
ซึ่งจะช่วยวางอยู่ 8 เมกะคอลัมน์ที่ SPAN ประมาณ 16 ม..
•โรงแรมชั้นจาก 101 / F ขึ้นไปได้รับการก่อสร้างขึ้นในที่เดิม
ใช้เกรด 60 คอนกรีตเสริมเหล็กขนาดใหญ่และเป็นแบบดั้งเดิม
ซึ่งจะช่วยแผงรูปแบบ,พร้อมด้วยบริการรับส่งโครงสร้างที่ 101 / F .
•จำนวนยอดรวมของโครงสร้างวัสดุใช้
•คอนกรีต 240,000 M 3 ให้ 98,000 ตันบาร์โครงสร้าง
27,000 ตันเหล็ก