1) On the Timesheet Entry tab, select the Timesheet Period by using the left and right arrow buttons. Alternatively, click the down arrow and select from the list of periods.
2) Click the Edit button at the bottom of the window to display your timesheet for that period.
3) Click on a blank line in the Project Number field on the left-hand side of the grid to view your list of projects. Then scroll up or down the list to select the one you want. (This list must be set up in advance. Refer to Define Workload for instructions.)
4) Enter the hours worked on that project in the appropriate field for that day. Note: the minimum time interval that can be entered is 0.25 of an hour.
Important note for contractors, part-time and casual staff! You must also enter the number of hours worked in the Normal - (Pay) row directly below the main timesheet grid.