1.10.2.2 Main Powerhouse(1) Ground of the main powerhouse: concrete+cement mortar finishing (2) Handrails at different parts: Stainless steel handrails are applied(3) Walls: All walls will be adopt the fairfaced wall (with caulking and with without wall decoration).(4) Ceiling: it is to adopt the light steel double-layer roofing (5) Doors and windows: the normal doors and windows are aluminum alloy doors and windows (or plastic steel doors or windows) aluminum alloy rolling shutter doors and the parts with fire protection requirements shall be steel fire doors.(6) Colors: the colors in the generator hall of the generator floor shall be selected as bringe tint ; the colors of the travelling crane, generator casing and local panel and board shall be harmonious with the colors of the ground and the walls.