According to attached Shutdown plan 2014, each KPC Train will be S/D only for 2-3 days in September. Therefore, in order to complete properly the all required installation for confirmed injection points of Neutralizer at Train A/B/C and Antifoulant at Train D, you should consider below actions beforehand:

Neutralizer injection point

• Put into to Shutdown activities the installation of injection point
• Assist to KPC oil plant superintendent to prepare notification for assemble trough SAP
• Identify the current location of appropriate quills and spares.

Antifoulant injection point

• Put into to Shutdown activities the installation of injection point
• Assist to KPC oil plant superintendent to prepare notification for assemble trough SAP
• Identify the current location of appropriate spares.
There is still one outstanding action about PSV set pressure which is being clarified, however assembling of relevant injection point need to be completed during the S/D.
0/5000
From: -
To: -
Results (Russian) 1: [Copy]
Copied!
Франческо,

согласно прилагаемой выключения план 2014, каждый поезд КЗК будет S/D только на 2-3 дня в сентябре. Поэтому, для того, чтобы правильно выполнить все необходимые установки для подтвержденных инъекции точек нейтрализатор на поезд A/B/C и Antifoulant на поезд D, вы должны рассмотреть ниже действия заранее:

точки инъекций нейтрализатор

• Положить в завершение деятельности установки точки инъекций
• помощь для КЗК нефти завод суперинтендант подготовить уведомление для собрать через SAP
• определить текущее местоположение соответствующих перья и запасных частей.

Antifoulant инъекции точки

• положить в завершение деятельности установки точки инъекций
• Содействие для КЗК нефти завод суперинтендант подготовить уведомление для собрать через SAP
• определить текущее местоположение соответствующих запасных частей.
есть еще один выдающийся действий о ПСВ набор давления, который уточняется, однако монтаж соответствующих инъекций точки должны быть завершены в течение S/D.
Being translated, please wait..
Results (Russian) 2:[Copy]
Copied!
Francesco,

According to attached Shutdown plan 2014, each KPC Train will be S/D only for 2-3 days in September. Therefore, in order to complete properly the all required installation for confirmed injection points of Neutralizer at Train A/B/C and Antifoulant at Train D, you should consider below actions beforehand:

Neutralizer injection point

• Put into to Shutdown activities the installation of injection point
• Assist to KPC oil plant superintendent to prepare notification for assemble trough SAP
• Identify the current location of appropriate quills and spares.

Antifoulant injection point

• Put into to Shutdown activities the installation of injection point
• Assist to KPC oil plant superintendent to prepare notification for assemble trough SAP
• Identify the current location of appropriate spares.
There is still one outstanding action about PSV set pressure which is being clarified, however assembling of relevant injection point need to be completed during the S/D.
Being translated, please wait..
Results (Russian) 3:[Copy]
Copied!
Франческо,ветровому в соответствии с прилагаемыми Shutdown плана 2014 года, каждое "КПК" поезд будет S/D только для 2 - 3 дней в сентябре. Поэтому, с тем чтобы завершить должным образом все необходимые установки для подтвержденных точек впрыска от Нейтрализующая на ж/A/B/C и Antifoulant на ж/д, вам следует рассмотреть вопрос о ниже действия:ветровому Нейтрализующая точки впрыска прошлом месяце- Положить в процедуру выключения установки точки впрыска
- оказывать содействие "КПК" масла суперинтенданта для подготовки уведомления для сборка маслосборного поддона SAP
- определение текущего местоположения соответствующих пиноли и запасных частей.ветровому Antifoulant точки впрыска

( в для остановки деятельности установка точки впрыска
- Оказывать содействие "КПК" масла суперинтенданта для подготовки уведомления для сборка маслосборного поддона SAP
- определение текущего местоположения соответствующих запасных частей.
там по-прежнему является одним из выдающихся действий о PSV установить давление, которое уточняется, однако сборка соответствующих точки впрыска должно быть завершено в течение S/D.
Being translated, please wait..
 
Other languages
The translation tool support: Afrikaans, Albanian, Amharic, Arabic, Armenian, Azerbaijani, Basque, Belarusian, Bengali, Bosnian, Bulgarian, Catalan, Cebuano, Chichewa, Chinese, Chinese Traditional, Corsican, Croatian, Czech, Danish, Detect language, Dutch, English, Esperanto, Estonian, Filipino, Finnish, French, Frisian, Galician, Georgian, German, Greek, Gujarati, Haitian Creole, Hausa, Hawaiian, Hebrew, Hindi, Hmong, Hungarian, Icelandic, Igbo, Indonesian, Irish, Italian, Japanese, Javanese, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Korean, Kurdish (Kurmanji), Kyrgyz, Lao, Latin, Latvian, Lithuanian, Luxembourgish, Macedonian, Malagasy, Malay, Malayalam, Maltese, Maori, Marathi, Mongolian, Myanmar (Burmese), Nepali, Norwegian, Odia (Oriya), Pashto, Persian, Polish, Portuguese, Punjabi, Romanian, Russian, Samoan, Scots Gaelic, Serbian, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenian, Somali, Spanish, Sundanese, Swahili, Swedish, Tajik, Tamil, Tatar, Telugu, Thai, Turkish, Turkmen, Ukrainian, Urdu, Uyghur, Uzbek, Vietnamese, Welsh, Xhosa, Yiddish, Yoruba, Zulu, Language translation.

Copyright ©2025 I Love Translation. All reserved.

E-mail: