Dear All,
This morning Exterran team at ERWN was reported to control room that about ERWN-25 liquid was leakage between flange of X-mas tree and flange of wing valve as per the following timeline.
06:20 : 2 Exterran + 3 Crane Mechanic onboard.
• Found liquid was leakage at between flange of X-mas tree and flange of wing valve on ERWN-25.(well open to production manifold @ 30/64 chks, tubing pressure 700 Psig)
06:28 : Shut in & Secure well ERWN-25.
• Closed lower master valve, hydraulic master valve, wing valve, choke valve & 3” VB-90 Prod, Test, BC manifold valves.(By Exterran)
06:30 : Exterran informed control room.
06:35 : Control room informed RMT shop.
06:38 : RMT Shop communicated with ERWN for situation.
• Exterran observed about 10 mins, liquid stopped leaks.