1.1.3 Basic data1. On-gird energyThe installed capacity of Houay Por H translation - 1.1.3 Basic data1. On-gird energyThe installed capacity of Houay Por H Lao how to say

1.1.3 Basic data1. On-gird energyTh

1.1.3 Basic data
1. On-gird energy
The installed capacity of Houay Por HPP is 15 MW, and the average annual energy output is 63.3 GWh. The effective energy output is 95% of average annual energy output, being 60.14 GWh
0/5000
From: -
To: -
Results (Lao) 1: [Copy]
Copied!
113 ຂໍ້​ມູນ​ພື້ນ​ຖານ
1​. ກ່ຽວ​ກັບ​ການ gird ພະ​ລັງ​ງານ
ຄວາມ​ສາ​ມາດ​ຕິດ​ຕັ້ງ​ຂອງ​ບ້ານ​ຫ້ວຍ Por HPP ເປັນ 15 ເມ​ກາ​ວັດ​, ແລະ​ໂດຍ​ສະ​ເລ່ຍ​ຜົນ​ຜະ​ລິດ​ພະ​ລັງ​ງານ​ໄດ້​ປະ​ຈໍາ​ປີ​ແມ່ນ 633 GWh​. ຜົນ​ຜະ​ລິດ​ພະ​ລັງ​ງານ​ປະ​ສິດ​ທິ​ພາບ​ແມ່ນ 95​% ສະ​ເລ່ຍ​ຜົນ​ຜະ​ລິດ​ພະ​ລັງ​ງານ​ປະ​ຈໍາ​ປີ​ຂອງ​, ເປັນ 6014 GWh
Being translated, please wait..
 
Other languages
The translation tool support: Afrikaans, Albanian, Amharic, Arabic, Armenian, Azerbaijani, Basque, Belarusian, Bengali, Bosnian, Bulgarian, Catalan, Cebuano, Chichewa, Chinese, Chinese Traditional, Corsican, Croatian, Czech, Danish, Detect language, Dutch, English, Esperanto, Estonian, Filipino, Finnish, French, Frisian, Galician, Georgian, German, Greek, Gujarati, Haitian Creole, Hausa, Hawaiian, Hebrew, Hindi, Hmong, Hungarian, Icelandic, Igbo, Indonesian, Irish, Italian, Japanese, Javanese, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Korean, Kurdish (Kurmanji), Kyrgyz, Lao, Latin, Latvian, Lithuanian, Luxembourgish, Macedonian, Malagasy, Malay, Malayalam, Maltese, Maori, Marathi, Mongolian, Myanmar (Burmese), Nepali, Norwegian, Odia (Oriya), Pashto, Persian, Polish, Portuguese, Punjabi, Romanian, Russian, Samoan, Scots Gaelic, Serbian, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenian, Somali, Spanish, Sundanese, Swahili, Swedish, Tajik, Tamil, Tatar, Telugu, Thai, Turkish, Turkmen, Ukrainian, Urdu, Uyghur, Uzbek, Vietnamese, Welsh, Xhosa, Yiddish, Yoruba, Zulu, Language translation.

Copyright ©2025 I Love Translation. All reserved.

E-mail: