Installation of a machine
Leveling installs a spirit level on the principal axis of the following figure, and takes out the level about the direction of X and each Z axis
The leveling bolt in the position of ABC performing
1. A left side cover is removed and a spirit level is put on even portion on a principal axis
2. The level is taken out with the leveling bolt of ABC
3. The bolt of DE is applied, and it check that load is equally added to all the leveling bolts and fastens a lock nut so that the level may not be out of order
Removal of a fixture
Please connect a power supply after removing this three fixture with which the fixture of X,Z and a turret is attached to the position of the following figure.