Results (
Japanese) 1:
[Copy]Copied!
Please verify if seal washer assembly befor cooling does not effect change of material charactoristic or function.Install the Master samples 200Kpa(439154) ,100Kpa(439306) of endplate assembly with making at weldng process and assembly process.Please submit idea of counter measures against spatter at inner ring welding as well as its schedule. Also inform inspection method of inner ring to be properly welded at the correct position. (instead of appearance check)Press process : Check red box rule and red box should be always set at near by location of process.Press process : Documents KYUSHO punching is too dirty to read.Pleating process : Paper marking nozzle is dirty.Pleating process : Standard of Paper width of incoming check sheet has no tollerance to judge.Please moution minimum width of paper with tollerance of "-0"Epoxy process : Please check the cleaning standard of the spray machine. (Nozzle and inside chamber)Element Assembling : Please check handling rules grue spray process of suspended endplate with over flowed grue in line.Please set fixed area for red box.
Being translated, please wait..
