Second, relevant costs are future costs. Past costs (those that have
already been incurred) are referred to as sunk costs. They are irrelevant
to future decisions because they cannot change the course of future
events once they have been incurred. For example, a community college
decides to implement an institution-wide document management system.
Costs over the three-year implementation period are estimated at
$1,000,000. Savings over the life of the system are estimated at $1,200,000.
As a result of the estimated $200,000 overall savings, the project is
approved.
Results (
Indonesian) 2:
[Copy]Copied!
Kedua, relevan biaya adalah biaya masa depan. Melewati biaya (yang memiliki
sudah dikeluarkan) disebut sebagai biaya hangus. Mereka tidak relevan
untuk masa depan keputusan karena mereka tidak bisa mengubah arah masa depan
peristiwa setelah mereka telah dikeluarkan. Sebagai contoh, community college
memutuskan untuk menerapkan sistem manajemen lembaga di seluruh dokumen.
Biaya selama periode tiga tahun implementasi ditaksir
$1,000, 000. Tabungan atas kehidupan sistem diperkirakan sebesar $1.200, 000.
hasil perkiraan $200.000 tabungan secara keseluruhan, proyek ini
disetujui.