Results (
Vietnamese) 1:
[Copy]Copied!
Dear Hai, Please find attached your file sent by last Friday. I refer to the lines 22, 34, 26-39, 44, 48, 66, 74 and 80 with the following information: Line 22: We can produce a first board without this motor, but we cannot run continuous production without it!!!!! Line 34: We can make a first board and start production without lab equipment, but we will not be able to check the quality of the product, make necessary adjustment in the process to adjust the quality and thus have a big chance to find out later, that all our start up production is of unsellable quality. A good way to waste large sums of money for raw materials! Line 36 – 39: We will not be able to produce a first board nor will be able to run production without these production chemicals. Line 44: Without these encoder cards no first board can be produced! Line 48: We can produce a first board and go into production without this, but we do not have full fire protection in our process without this material installed! Line 66: First board production is possible without this device, continuous production is not possible! Line 74: No first board or production without these parts! Line 80: required for water preparation for the steam generator. No NaCl tablets and we run the high risk to have buildup on the steam generator oil coil, which will lead to downtime and extra cost! I would appreciate to be updated permanently about the status of all this items, as our vendors need information how to plan their staff. If we do not get these pars soonest there also is the risk, that vendors’ supervision is not available, when we need it (no first board without at least DSE, Valmet and INTEC staff on site)! Furthermore we need the bow screen installed to go into production, and, last but not least, STAFF! All staff has to be on site for going into one shift production, as mentioned many times!!!!! Best regards Christoph Ludaescher
Being translated, please wait..
