1. Pump man found tank gain and inform Operator
2. Supervisor and Pump man check flow at shale shaker and found some gas
3. Supervisor inform Operator to secure well, and inform the situation to WOS
4. Operator simulate the well kick horn signal
5. Operator and Technician install the low torque valve
6. Operator close BOP pipe ram by koomey remote
7. Operator and Technician install the kelly hose for kill well
8. Supervisor inform Forklift operator and Pump man to mix brine, and inform all rig crew on work basket come down to choke manifold to observe the well pressure together
9. Supervisor inform Pump man to kill well
10. The situation back to the normal condition