During the site survey, it was agreed with the SACON PMT that eleven (11) sites having a maximum length of (22 KM) will be connected with this Network through a dark fiber without any additional. However if the length exceeds, then the additional length shall be compensated to SITAF either by deletion of the similar work from other parts or compensated as mentioned hereunder in other paragraphs.