At its most elementary level, site selection for LNG loading terminals is predicated by the location of production areas and, at receiving terminals, the situation is dependant upon the location of markets. Thereafter, fine t니ning within the selection process is influenced by the optimisation of infrastr니cture costs such as gas transmission systems, access to trunklines and other distribution networks