Results (
Thai) 3:
[Copy]Copied!
Precautions:
Lot sizes need to be minimized.
Workstation capacity should be balanced whenever possible.
Preventive maintenance should be carried out, so as to minimize machine breakdowns.
Set-up times should be reduced wherever possible.
Reduction in lead times and frequent deliveries should be incorporated.
Being translated, please wait..