Results (
Thai) 1:
[Copy]Copied!
•*An estimating technique in which an algorithm is used to calculate cost or duration based on historical data and project parameters.•Produces higher levels of accuracy based on the data and the sophistication built into the model.•Can be applied either to a total project or to segments of a project, in conjunction with other estimating methods.
Being translated, please wait..
