Komiya president Eguchi adviser everyone The weekly work report NO102 we attached. 1. The waste water from the laundry, the factory will consider reviewing the test value from to the production environment corrective work on 2. 2D building assembly area cleaning chamber is adjust to the clean room and the environment equivalent to the cleaning chamber and clean room<<< mounted between differential pressure gauge. Differential pressure gauge is get paid than MPC like relocation plan 3. And air conditioning in the wash chamber after the completion of the cleaning chamber around construction work in MPC-1 Canteen. 4. MPC-1 roof repairs <<< November 11, purchase order acceptance three-story part is final coat complete warehouse building sealant filling, undercoat start5. MPC-2 300 ton press construction<<< December 6 the start of the epoxy base paint from day6. MPC-1 fire protection work<<< December 6, the rising concrete completion of the first floor unit. Installation of piping support hardware, laying the start of the main pipe from the rear of the building.7. 2D Building 2F part, emergency lights three locations is replaced with a new one the lamp body because it does not light up. 2D building, charging is also very light of Canteen building, we will continue to check the lighting at any time. Place where non-point there will be replaced with a new one.
Being translated, please wait..