In addition to avoiding generation costs,the introduction of renewables also displaces the need for firm capacity NERC,in cooperation with state public utility commissions and independent system operators(ISO),develop star gets for the amount of firm capacity above the regional peak load a balancing area(BA)must have (North American Electric Reliability Corporation,2013).