6. TRANSPORTATION&LIFT ING WORK
a) All tools and lifting equipment shall be in good condition and used to be suitable to weight to be handled.
b) Tools delivered by vender to be checked and made available by the supervisor of the operation.
c) Operation shall be instructed and trained in the safe use of the equipment.
d) All lifting equipment and operators must be certified by Fellow Engineer.
e) Lifting gear shall have Fellow Engineer.All sling, cable and shackles shall be inspected by the ringer in charge
and by HSE inspector, color coding to be used.
f) All machinery and lifting equipment shall be kept in well maintained condition to reduce emissions.
g) Precautions will be taken to minimize the risk of fuel spillages. If there is any spillage , the material will be removed as specified in the spill contingency plan.