For example, the first and biggest urban reclaimed water recharge project in China, the Gaobeidian Groundwater Recharge Pilot Project in Beijing which was completed in 2003 and reached 200 m 3 /d of recharge amount under the design condition composed of a surface recharge system and a rapid infiltration shaft system (Guichun Yun et al., 2004). It is shown in Figure 4.