Three other employees were also forced from the building by the release. Joined by the plant superintendent and the plant manager, the employees gathered outside an upper level doorway (Figure 3). The senior operator re-entered the building wearing a respirator, and was able to start emergency cooling water flow to the reactor jacket. However, the building exploded less than 30 seconds after he exited.