2. The Guarantor and/or the Sellers shall obtain all approvals for the construction of, and at their own cost construct, the 30 metre wide access road connecting Nguyen Huu Tho Street to the Land as shown in grey on the drawing attached at Schedule 1 (the “Access Road”).3. The Guarantor and/or the Sellers shall complete the construction of, and procure the grant of the right of way to the Target over, the Access Road (the “Access Road Completion”) no later than 12 months from the date of the SPA (as defined below) (the “Construction Period").