The numbers shown in the matrix above are qualitative and they determine just the desirability of the outcome than the others. The situation [Client (gives no extension time), contractor (non over time work)] can lead to the worse status that may cause the project suspension. This game has two Nash equilibrium points, (no extension time, overtime work) and (extension time, non overtime work). This means that eventually, one of the players (client or contractor) should compromise to help in continuing of the project.