2.1 planning the layout based on the information that the owners of the mission, as well as information about the law relating to the provision of property management, project and lay out an initial draft project to document the participants hired contractors to offer jobs to consider approval of the owner of the procedure.
2.1.1 the draft chart of the area
2.1.2 the draft building consists of a map. Imaging image cut (or 3D).
2.2 the draft final design.
Contractors will use the information that has been approved by the issuance of an initial draft to draft the 2.1 final offered employment. Documents to contractors who hire agreed and approved the procedure consists.
2.2.1 chart of the area
2.2.2 draft building Show map Image format was developed and then cut.
2.2.3 information, materials, and equipment to be used in the project brief.
2.3 functional description construction.
After the final draft was approved by the employment. Contractor shall make the details of construction to be used as a contract document. Documents to contractors who employed this procedure consists
2.3.1 the map display. Roads and utilities outside the building.
2.3.2 the chart of every layer.
2.3.3 the display the Elevation 4 images.
2.3.4 the display cut at least 2 images.
2.3.5 information components attached. 
2.4 how to bid Contractor will cooperate in the bid: