Results (
Thai) 1:
[Copy]Copied!
We would like to request technical meeting/review for status report & summing up for drawings of electrical system by follows agenda: 1. Status of WK5 engineering & status, concern design issue for temporary services, discuss the new PTT NGV (if any) cubicles & how JV to tie-in or remain un-change; 2. Confirm status of WK5 temporary installation & shutdown status;3. Re-arrangement to SN1 battery charger review & discussion;4. Grounding system design for SN2 as alternatives to final drawing & design revision; 5. Presentation the variations of load list from vendor to latest revision of single line dwg for identify such changes; 6. Shop dwg for BVS panel review for start production;7. AOB
Being translated, please wait..
