Following is the schedule and list of activities for D1/G1-301 · Removal of steady bearing broken arms and scaffolding up to the height of steady bearing (To be completed by 12 midnight)· Removal of steady bearing bush holder, plate, sleeve etc (From 12 midnight to 8 AM on 17th Oct)· Shaft verticality and runout checking inside the vessel (8 AM to 12 noon on 17th Oct)· PT of all welds of cladding and all welds of agitator hub blades etc up to the height of the steady bearing (1 PM to 8 AM on 18th Oct)· Gear box windows opening for gears visual inspection (by 9 AM on 17th Oct)· Shifting the damaged components of the agitator to MEC (8 AM to 12 noon on 17th Oct)· Repairs of the damaged components (12 noon on 17th Oct to 12 noon on 19th oct) tentative.· Repairs of the damages inside the vessel (8 AM on 18th oct to 12 Noon on 19th oct) Anodizing to be done on repaired components.· Assembling the components (12 Noon on 19th Oct to 12 noon on 20th Oct) Anodizing to be done on repaired components.· Scaffolding removal (12 Noon on 20th Oct to 8 PM on 20th oct· Final inspection, anodizing at bottom of the vessel (8 PM to 12 mid night on 20th Oct)· De-blinding and man door box up (12 AM on 21st Oct to 12 PM on 21st Oct) The above is a tentative plan and some of the activities may takes more time. Let us try to achieve it.
Being translated, please wait..