Overhead is applied by using a two-stage process. First, overhead is allocated to the paper and finishing machines by using the direct method of allocation with carefully selected cost drivers. Second, the overhead assigned to each machine is divided by the budgeted tons of output. These rate are then multiplied by number of pounds required to produce one good ton.