Results (
Vietnamese) 1: 
[Copy]Copied!
2.1.2.1. Drawing of the general plan.2.1.2.2. Plans for each level with their surface areas (in M2) and the particulars for each premise.2.1.2.3. The sections and cuts for the establishment.2.1.2.4. A plan of the typical room to scale featuring implemented furnishing and equipping and details of the characteristics of the façade and the window.2.1.2.5. Succinct specifications concerning the main materials to be used for interior and exterior decoration.2.1.2.6. The analysis of exterior pedestrian circulation, vehicle circulation and fire fighting.2.1.2.7. The schematic plans of the building’s main technical specifications and the associated vertical transportation.2.1.2.8. A description of the design of the preliminary design phase.2.1.2.9. Construction schedules.2.1.2.10. Estimated costs (if necessary).2.1.2.11. Preliminary decoration draft.Within fifteen (15) working days after receiving KIENA’s preliminary design result, MHI should finish the following works:2.1.2.12. Examine the preliminary design result and give recommendations on how to improve them or adapt them for compliance with the Applicable Standards.2.1.2.13. Approve preliminary design plans which it considers are consistent with the Applicable Standards or which are modified according to its recommendations.2.1.2.14. Will draw up certain general outlines in connection with the installation work for those parts of the Condotel which require to be reconsidered and notify in English to KIENA of them.
Being translated, please wait..
