DolWin1
Another example of this type of solution
is the 800 MW DolWin1 HVDC Light connection,
which will bring power to the
grid connection point at Dörpen West in
Germany, about 90 km inland ➔ 3. ABB is
responsible for system engineering, including
design, supply and installation of
the offshore converter station, including
the platform, 75 km of DC submarine
cables, 90 km of underground cables and
the onshore converter station. Scheduled
to be operational in 2014, this network
of offshore wind power parks is
expected
to reduce CO2 emissions by
3 million t per year.