The ATS portion of Central Control will be fully described in accordance with the CDRL as part of the CCC Design Review. Central Control will be configured in separated functions; separated workstations; and separated performance monitoring displays to take advantage of such commercially available systems. The Central Control will monitor and control: train operation; power distribution system; communication systems and other similar systems (e.g., access control and intrusion detection) with providing efficient and logical APM System operation by the Central Control Operator (CCO), providing all of the required CCO interfaces, and complying with the redundancy requirements of TP Section 11.4.1. ATS subsystem will also monitor climate condition by utilizing signal of weather station and seismic sensor which are provided by others into OCC.