1.1.1 Geographic Location And External Transportation of the projectThe transportation conditions of the HPP area as follows: The external transportation route of the HPP will be from Kunming to the dam site: Kunming−Yuxi−Yuanjiang –Mohei Pu-er− Mohan−Muang Sai –Luang XeXeLuang Prabang −Vientian−Site of the HPP (Dam site ), the total length of which is 2.080 km. The road from the headwork complex to the powerhouse complex id of earth pavement , the width of the road pavement is about 7m which meets the requirement s for transporting equipment. This HPP will only need to build the road from the existing road to some sites, and the transportation conditions of the HPP are relatively good. Geographic location of the project area is show in Fig 1.1− 1