After checked, There are 2 possible cause related to our CPMH;
1.) The cut of time was differences from RDM (06:00-06:00) and RAMs (24:00-24:00)
2.) The number of Manpower between Operation and HR
Moreover, The attached file that I sent to you for the actual data which align with our CPMH