Results (
Thai) 1:
[Copy]Copied!
The scope of supplies and services is deemed to be in balance between the
drawings and the specification. Contradictions between drawings and
specifications, if any, shall be brought to the attention of the Client by theContractor and the correct requirement shall be obtained.
Being translated, please wait..
