PMP Process Introduction
Employees and supervisors should complete this form as indicated in each section. Please refer to the Performance Management Process
website for additional PMP information, guidelines, and further information on linked processes, such as: development planning, 360 feedback, behavioral competencies, and diversity. In addition, you may contact your Human Resources business partner for further guidance. Use this link to upload any attachments if necessary.
Your performance will be evaluated based on your results and how those results are achieved. The Chevron Way and Chevron's We Lead
- Leader Expectations are at the core of how we get things done. Talk with your supervisor to identify the appropriate leadership role for your position to guide your performance and development agreements.
Section 1 - Employee Information
Last Name:
First Name:
Middle Name:
Email: XXXXX@chevron.com
Employee ID:
Username: WACI
Position Production Superintendent Company/Department: Erawan Asset Location: Offshore Erawan
Period Covered Start Date: 01/01/2015
Period Covered End Date: 12/31/2015
Time In Position:
We Lead Leader Role: Supervisor
Section 2 - Summary of Business Unit or Department Objectives As Related To Your
Role
Please include a summary of Business Unit or Department Objectives as related to your role.
Summary:
To support Business Unit Goals;
1. Prevent fatality, serious injury and high consequence process safety incidents by enhancing leadership accountability, operational discipline, human performance, contractor HES management, safeguards verification & validation and application of lesson learned from Major Incidents Studies.
2. Achieve 2015 Thailand performance scorecard targets with emphasis on achieving world class OE performance, restoring gas well capacity, controlling OPEX and execute projects with excellence and maintaining concession longevity.
3. Meet or exceed target of Well Factory Efficiency, Production Efficiency, Loss Production Opportunity (LPO) and Offshore Efficiency
Improvement
4. Achieve Base Business and Reservoir Management performance metrics by reducing unplanned downtime, capturing targeted reserve additions, achieving targeted reserves replacements ratio.
5. Minimize growth on manpower level and enhance organization capabilities by implementing improvement plan for Operator & Maintenance Skills training program and leadership development under We Lead Framework.
Section 3a - Performance Agreements
Please use this link to upload and view any attachments if necessary. Click here for PMP section instructions.
AGREEMENT:
1. To achieve OE performance targets through improved operational discipline, improving the effectiveness of high priority processes and process safety, being personally accountable for safe choices, and focusing on the environment stewardship and compliance.
1.1 To achieve Zero DAFW case and TRIR 0.22: Agree Action Items;
a. Achieve CHESM audit at job site > 90% for Production related tasks i.e. PVI, MRU catalyst Change out and Chemical Trial program.
b. Increase number of NM report at least 20% higher than year 2014.
c. Quarterly conducting the refresh NM knowledge for Supv's and T-3 level. d. Refresh OE knowledge by Supv's to all Tech on semi-annually.
e. Production team to achieve 90% participation of 24 BBS/year for non-qualified and 12 BAPP/year for qualified observer.
f. Meet standard BAPP Performance for all 6 elements in spider chart are with range 6-12 months and actions implement >90%. g. Achieve knowledge transfer of each responsibility Champion during shop meeting once a month per Champion
h. Achieve 2 observation (PTW audit)/supv/rotation)
i. 100% PTW Audit for open flame and CSE, 50% for other permits on CPP, phase 1
j. Min. 1 visit by supv team for all p/f except PSWA, PSWB, SBWA. All supv. visit remote min. 1 time / rotation. k. Include V&V Goals in all Tech level PMP
l. Each champion set up annual action plan for own target and include in PMP
1.2 Achieve all Asset Integrity: Agree Action Items;
a. Develop and follow up AI tracking according to shaping plan
1.3 Achieve 2015 PSM shaping plan for Erawan Asset: Agree Action Items;
a. Achieve Zero Tier 1 LOC case, Tier 2 < 2, Tier 3 reduce 5% from year 2014
b. Set up plan to inspect the conductor support conditions. RMT to record and update in share drive with tracking system.
c. ERCPP and phase 1 platform to conduct process drill 2 events/ quarter / platform.
d. Supervisors & T3 (rotate) to conduct PSM and LL sharing to team during shop meeting.
e. Supervisors to conduct PSM refresh to team minimum 1 time and all subordinates attended and pass the test.
f. Quarterly audit all control room to ensure all operator is knowledgeable and fluent in OPM usage.
g. Supv to conduct V&V for OPM usage by conducting PS drill for CPP and Phase 1 at minimum 8 time per year and cover all teams.
h. Enhance Safeguard Verification Action by onsite V&V engagement and Supv. to coach all T's level for onsite V&V by Q1. Set target for each tech and include in PMP.
1.4 Achieve Environmental Stewardship expectations: Agree Action Items;
a. Achieve PW injection 100%
b. Achieve flare emission target of < 1.5 for ECPP and < 0.5 for all phase 1by developing the valve passing tracking file and follow up with
action plan to close out.
b. Complete implementation of SC on Erw. Complex, phase 1 and all remote p/f per CA requirement by developing the CA requirement tracking file and follow up with action plan to close out
RESULTS (entered by Mr.xxxxxxx):
No comments
2.1 Production Efficiency, Facility Equipment & Well Reliability:
Agree Action Items;
a. Achieve PE > 94.5%
b. Achieve Planned / Unplanned LPO target <3.27% / 1.91% of production respectively
c. Achieve Remote BC prod. weight reliability and runtime > 95.9% and 86.1% respectively
2.2 Provide support to OIM to achieve Project Management and Execution: Agree Action Items;
a. Lead to complete all assigned PSSR and achieve 100% PSSR conducted and completed in MOC system prior to start-up.
b. Provide supports to all key FE projects by participating in Risk Assessment, HAZOP, HAZID and follow up assigned action items.
c. Expedite to complete pending FE projects that target to complete by end 2015;
- Fire Water system expansion by Apr, 15
- New CHF/RVP by Q2, 15
- MOV 04 leak mitigation by Q3 and s/d function mod. by Q4, 15
- Condensate transfer pump replacement
- ECPP power upgrades (diesel gen.)
RESULTS (entered by Mr.xxxxxxxx):
No comments
AGREEMENT:
3. Achieve Capital and Operating Cost Management Targets:
3.1 Cost Management and Optimization initiatives: Agree Action Items;
a. Control direct OPEX within $ 149 MM and MEJ 10% of $45 MM budgets
b. Explore Initiatives and achieve cost reduction of $ 200K from direct OPEX
3.2 POB Optimization: Agree Action Items;
a. Achieve bed utilization > 95%
b. Control chopper cost by reducing no-show number from 65 to < 50 for a whole year. Quaterly check with NST airbase for tracking and follow up.
3.3 Lean Sigma:
Agree Action Items;
a. Provide assistance to OIM to achieve 100% LS application for s/d > 5 days and new p/f PoP
b. Provide support to Project manager as a LS Champion for the assigned LS project (Project reduce downtime for pigging)
RESULTS (entered by Mr. xxxxxx):
No comments
4.1 OMST & TOSCAD
Agree Action Items;
a. Develop the OMST & TOSCAD Priority list
b. Develop the schedule to complete OMST assessment for all P1 & P2 (P1 by Jul ansd P2 Dec.)
c. Complete assessment of all proposed P1 by July and P2 by December
d. Close gaps 100% of previous level and build plan (IDP) for current year assessment P1 by Q3, P2 by Q4
e. Provide support to Achieve TOSCAD targets for selected T3 - Supt (Participate and provide support to subordinates to achieve
TOSCAD targets for T3-Supt.
4.2 Achieve formal mentor / mentee agreements and Include mentor / mentee element in PMP and request mentoring comment in PMP
feedback
Agree Action Items;
a. Set up formal Mentor and Mentee according to the agreed succession plan by Apr. b. Develop the Personal Development register with timeline and put into CDP by Jun.
c. Achieve 100% mentor/mentee agreements, obtain mentoring feedback and inclusive in individual PMP
4.3 Enhance quality of We Lead program: Agree Action Items;
a. Supv to demonstrate We Lead campaign to workforce in every 6 months
b. Identified role of each team members
c. Individual to demonstrate We Lead to others
d. Agreed We Lead and put in PMP.
4.4 Work Life Balance: Agree Action Items;
a. Reduce OT, off-duty assignment / work over by 20% of 2014
b. Zero case of extra work > 30% time off.
c. Zero vacation buy-out
RESULTS (entered by Mr xxxxxxxx):
No comments
Section 3b - Achieving Results the Right Way
Summarize how you demonstrated Chevron Way behaviors and We Lead - Leader Expectations to achieve your performance results.
Refer to the We Lead job aid for examples.
1 Align & Inspire:
2 Build Relationship:
3 Grow Capabilities:
4 Deliver Results:
Results:
Section 3c - Development Agreement(s)
Please use this link to upload and view any attachments if necessary. Click here for PMP section instructions. You can also click here to
view the Competency Management website. There you can find the Soft Skills Competency Map that includes suggested development activities you may want to consider.
1. To increase my Leadership skill by attending the Company provided soft skill training for Leadership/Supervisor level.
2. To achieve Company expectation and Compliance requirement for the required Training courses for Production Supt role.
RESULTS (entered by Wichit Chakkasan)
Agree Action Items;
1. To attend “ERCPP iHAZID Revalidation 2015” on 30-Mar to 02-Apr-15.
2. To attend “Green Belt” Lean Sigma training 12-13 Mar, 20-22 M