The current replenishment process is that, after each usage entered, a restock order is triggered automatically from WH1 to replenish the Loanset. This system does not work well as it triggers too many deliveries from DHL.
In addition, the forecast in Thailand is very inaccurate, and there is a requirement to better control how many implant sets are kept in BKK and CNX to make sure it will meet demand. A sort of “local safety stock” level is required in both sites for this (e.g. for LCCK, there should be min 3 sets in CNX and 5 sets in BKK)