I just want to ask if it is really need to perform level B on air compressor 190102-06. The last PM base on your report was already level B? The next PM schedule should be level A1 which is 250 hours? For the PM of air compressor, the level A1 to A6 PM should be every 500 hours and after that, level B will be every 3500 hours
Hope to inform you accordingly