The flow was registered by flowmeters in each subunit. The pumping was continuous throughout the day without variations in time. The outflow takes, located downhill from the 3 units, were installed with a filter grill between the tanks and the substrate in order to avoid blockage. The outflow wastewater flowed downhill into a 64 m storage take which was connected to a sprinkler system and used to irrigate the surrounding area.