1. 4th order GPS2. 5th order Traverse (5 Rings)3. 5th order branch traverse 4. 4th order trigonometric leveling 5. 1:5,000 Topographic map of construction lay out area (12 sheets)6. 1:5,000 Topographic Map of construction Layout area7. 1:200 cross section of dam site (2 pieces)8. 1:1,000 cross section of Houay Por Gully ( 2 Pieces)9. 1:2,000 Lon gitudunal section of complex area ( 2 pieces)10. Reservoir submerging investigation and survey11. Finding of known points12. Embedding and conjunction of cross section endpoints13. Survey of geological prospecting points 14. Point survey of draft gauge/water gauge