In construction of reclamation, blowing sand control head shower head with energy dissipation devices to reduce erosion force, to ensure that the reclamation level meet the design standards, as well as the flatness requirement. In drag during the period of construction , the ship shou ld be20recta imed sand mouth (tube) around 100 m range, establish the bamboo stick, spraying paint on a bamboo pole logo shown in reclaimed control level, ensure that land reclamation around blowing sand filling tube head position height to meet the design requirements.