هدا لاول مرة يحدث اثناء عملى فى الليلDear Sir,
It happened as follows:
1- The worker responsible for putting the inser inside the mold He put it incorrectly and he did not make sure he put it the right way.
2- There was not anything else. Only fiberglass material and insert.
3- Because of the worker put " INSERT" In-reverse.Not in the right place.
4- Due to the compression when closing the mold.
Problem Report The Mold: M: 3
- The team consists of three workers Plus One Operator" Filipino" for check Two Machines
At 04:10 am this three workers Muslims people at this time of Prayer stopped the machine for prayer the workers finished last shots and the worker " Mahaphuj Alam" ID 840 Islam contractor he put insert in reverse not been fixed in The exact location before the mold has been closed.then they went to prayer I was with them at this time exactly and
I went with them to prayer after we returned the worker Alam he thought it checked insert Area Or he thought it his Work colleague "Junaid Khan" ID 719 checked insert area thin he put material and closed mold.
At that time I heard a loud voice thin i went to machine quickly and we stopped machine.
Thin I Asked them to stop working.
Action plan to overcome such issues:
- I called a lathe "dcpi" then Technical come He said it will take 2 days for Repairing it.
- We will be careful that it does not happen again.
The night shift issue:
- During the past two weeks and the night shift is suffering from a shortage in the number of workers The number of absentees to 7 workers.
On 25th May, 2016 Double Meter Box mold has been damaged during the early morning:
This time I was working at Day shift.
So This is the first time there during my work at night.
- I will be careful that it does not happen again.
Best Regards,
Amr. SMC