Results (
Thai) 1:
[Copy]Copied!
•Existing service across a 1000 ft-wide river is provided by a ferry•Propose of two-lane bridge of a 1660 ft-long to replace the ferry service•Bridge construction cost is 42M of which 6M is accounted for by taxes•Foreign exchange of 24M and a shadow rate for foreign exchange is 1.75 times the official rate•Estimated construction is 4 years•Economic life 50 years, no salvage value•Annual maintenance 120,000 Baht for year 5th – 23th and 150,000 Baht for year 24th – 50th
Being translated, please wait..
