I see many B.U.s work 2 shift/with OT but the capacity is not even near maximum. Does it mean these B.U. have idle “lines” that are not staffed with DL? Because intuitively one would think that 2 shift with OT mean 24 hour work, and thus full capacity. (this is probably DL headcount fully utilization but not necessary equipment utilization) But if equipment / lines are still idle / excess, then the equipment utilization is not near 100% as yet. The analysts are struggled with this during our tour yesterday.