In addition to avoiding generation costs,the introduction of renewable also displaces the need for firm capacity NERC,in cooperation with state public utility commissions and independent system operators(ISO),develops targets for the amount of firm capacity above the regional peak load a balancing area(BA)must have (North American Electric Reliability Corporation,2013).