4. As well as MQA checks on the manufacturing line, please provide details of the procedure for maintaining the most current test standards, as well as calibrating the testing apparatus to ensure that all MQA testing performed is accurate and as per the project specifications provided.
5. Please provide details of the procedures in place to ensure that the correct material and equipment settings are controlled throughout the manufacture of a specific product or products.
6. Please provide details of the standard equipment maintenance regimes for the major machine items being utilized in the factory.
7. Please indicate the machine cleaning procedures in place, as well as quality assurance methods to ensure that the machines are adequately purged of foreign material prior to start-up.
8. Please provide details of those parts of the manufacturing process that are considered dangerous or of a high risk to quality, and what procedures are in place to ensure risks are managed effectively.